Plan so that no two butt joints are closer than 2 feet from each other.
Roll roofing installation step by step.
Install drip edge and install 9 cant strips of roll roofing material along the rake and eaves edges gable ends and lower roof edge such that the roofing strip overhangs the roof deck by 1 4 to 3 8.
Nail the roofing strips parallel to the roof edge set in 1 and 8 from the roof edge with nails spaced 4 o c.
Spread the roofing cement along the.
Apply roofing cement to the roof.
How to do it attach first course.
Adhere the joint where the cut edges of the shingles meet the dome with roofing tar.
Step 1 draw the base line for you to have a basis on where to proceed with the installation of roof rolls create a line to serve as a mark.
Prepare roof edges cant strips.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
Attach it to the valley with roofing nails spaced 6 inches apart about 3 4 inch from the edge.
10 easy steps for diy rolled roofing installation 1 spend some time cleaning the roof before beginning a rolled roofing installation project.
Using a measuring tape measure 35 inches 89 cm up from.
Place the top edge of the roofing along the chalk line.
Adhere the shingles adjacent to the flange with roofing tar.
Roll out and cut roll roofing to cover the length of the roof.
This aluminum flashing protects the edges of the roof sheathing.
Mark a chalk line to identify the end of your first layer.
If the plumbing vent is close to the peak of the roof lap the shingles over the peak of the roof.
Use a trowel to scoop up the roofing cement.
Cut the shingles to fit around the flange s dome.
Step by step roll roofing installation 1.
Installing the rolled roofing 1.
Along the eave measure 35 1 2 inches and run the chalk line along this point.
The line will serve as the guide where the first metal sheet will be installed.
Install a drip edge around the perimeter of the roof.
2 like any other roof project you should start this one by addressing the valleys.
Prepare a valley between joined roofs by cutting a strip that is 18 inches wide and covers the entire length of the.
3 take a roll of 18 inch wide roofing and use it to cover the length of the valley.