Determine if continuous headers are toe nailed to studs with 4 8d nails.
Roof framing checklist.
Along the edges and every 12 in.
The fields in the template include equipment standards of workers.
Approved documents which show.
Wall framing inspection checklist continued m.
Truss roof framing as per design.
Layout plans truss members connection schedule permanent bracing details dormers roof structures on manufacturer s drawings equipment appliances on man ufacturer s drawings location as per layout alignment bearing spacing connections to bearing points.
Locate the grade mark on the rafter to determine species and grade.
Toe nail rim board to sill plate at 6 on center.
Determine how many rafters you ll need for the roof.
Determine if double studs are face nailed with 10d nails at 24 in.
Add studs under all double girder truss double joist.
Job address is posted in a visible location per irc section r319 1.
For all new construction.
Roof must be complete before framing inspection.
Roof the ridges hips and valleys have shall be designed as beams for roof slopes 3 ft.
Depending on how wide the home is you can divide the total length in feet by two to determine how many trusses will be needed.
Get fix for any cut damaged joist or truss from joist or truss company.
Roof sheathing is nailed every 6 in.
The american plywood association says there s no reduction in strength for nails overdriven by 1 16in.
Permit residential framing checklist approved city stamped plans roof specifications and engineered floor system information is on site and accessible to inspector.
For most load bearing requirements a roof truss will need to be placed every two feet along the walls.
In high wind areas sheathing along the eaves rakes and ridges is nailed every 6 in.
2 bracing section 8 3 coupled roof connections ceiling joists to rafters collar ties to rafters 7 1 2 2 4 tie downs section 9 5 transfer of wall frame bracing 8 3 6 9 6 point loads including beams struts are adequately supported.
Determine if studs are toe nailed to sole plates with at least 3 8d or 2 16d nails.
Roof framing inspection checklist 1.
Building is safe and accessible.
R802 3 notches on the ends of rafters don t exceed the nominal joist depth.
R802 3 the rafters are framed opposite each other at the ridges.