Discussion code analysis.
Roof overhang setback.
The building inspector would not permit the overhang 3 stories up to exceed the setback.
A roof overhang of 3 or less may be permitted to encroa ch into required setbacks depending on the zone district and the allowed setback encroachments.
Be sure to include the roof overhang in your calculati ons.
However most jurisdictions also have different views on how much the will allow.
Provided that the state fire code is met.
Uncovered decks between 30 inches and 8 feet above grade may extend up to 8 feet beyond the front or rear yard setback.
They will be different on a multi story house.
Hypotenuse the overhang exceeded the permissable limit at one corner.
As an example someone could take advantage of this and build a balcony on the second floor hanging out over the entire setback space.
Covered porches that are open on 3 sides and on the.
Setback requirements charter references.
Due to the orientation base vs.
Roof or a roof with a pitch not to exceed four 4 foot vertical on twelve 12 foot.
Cantilevered features and roof overhangs are also subject to setback requirements except the feature or roof overhang may extend a maximum of 18 inches into the setback if they are at least eight feet above ground level.
Uncovered decks over 8 feet above grade may extend up to 4 feet beyond the front or rear yard setback lines and up to 2.
Eaves chimneys bay windows overhangs and similar architectural features may encroach into setbacks by up to three feet.
Determine the number of square feet of the roof.
Carport shall be separated by not more than twenty 20 feet and the roof overhang shall not exceed two 2 feet from the supporting stanchions on.
As always it depends.
I doubt the residents even notice.
In an r1 zone the following architectural features are allowed to encroach into the setback yards.
If the roof overhang is considered part of the building footprint and counted in the square footage then these overhangs tend to raise the tax burden for that home.
A roof overhang in excess of 3 is considered a roof of a partially enclosed structure and counts towards allowed building coverage of the zone lot.
Use the roof area and not the floor area.
Most jurisdictions will allow the roof line of overhang the setback line as long as it is still overhanging your own property.
You do not have to worry about the pitch of the roof.
Note the soil type that is con sistent with the sizing table.