Application of polymer modified bitumen liquid membrane with cement screed for non insulated roof slab.
Roof sheet installation method statement.
7mm aluminium alloy 3105 h46 temper pvf2 colour finish.
Coordinate all installation delivery and safety activities at site.
Roofing screws for corrugated sheets shall be galvanised and are to conform to bs 1494.
Roof installation method statement a basic guide to preparation introduction this guidance note gives practical information about creating a method statement.
The method statement was prepared by.
The information and in particular the recommendations relating to the application and end use of sika products are given in good faith.
The procedure shall be read in conjunction with contract specification wherever applicable.
This swms covers high risk construction work hrcw controls related to.
The roofing and cladding shall consist of outer and inner profiled steel sheets with an insulation blanket between them.
All locations to be marked as per approved drawing.
Note this method statement has been developed using the site specific risk assessment the designer s residual risk register the trussed rafter association s product data sheets and health and safety in roof work hsg33.
Length of nail shall suit the application and roof sheet manufacturer s recommendations.
A completed sample template has been included in appendix 1 and a blank template in appendix 2.
Before starting the roof steel truss installation necessary scaffolding or working platform shall be provided with green tag to reach and work at the height safely.
Safety method statement prepared by humphrey and gray ltd.
Make the appropriate method statement to submit to project manager.
This fabrication method statement covers the detailed procedure for fabrication and installation of any kind of steel structure decking slabs.
Before laying the screed cement slurry shall be brushed across the surface.
1965 and be complete with plastic washers.
Ensure all items to be installed on the roof which require penetrations through the roof membrane are placed prior to the application of the membrane.
If you wish to use the template in appendix 2 to construct your own documents.
The base plate level and the center line of the truss column shall be marked based on reference datum and coordinate points given by main contractor surveyor.