Installing drip edge on your roof.
Roofing gutter drip edge installation.
It is best to install a drip edge on a day with warm weather because it makes it easier for the shingles to be stripped back.
How to install drip edge flashing to a new roof.
You may need to nail through the starter strip into the drip edge.
If it doesn t pull the drip edge out slightly from under the shingles.
Slide the corner tight to the fascia.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
Ideally it is recommended to nail about every 12 inches.
You can use nails to tightly secure it.
Tools supplies tin sn.
Secure the drip edge with roofing cement.
For drip edge installation align it for directing water flow into gutter alongside the roof edges.
However keep in mind that tile shingles or materials like slate cannot be lifted so always install a gutter apron for new roofing.
Gently lift up the shingles on the edge of the roof and locate the nails holding the existing drip edge onto.
The roofer installed the drip edge tight against the fascia.
Begin at the lower corner of the roof and gradually progress to the top.
Make sure the corner is tight and that the bottom edge is tight to the fascia before nailing off the drip edge.
Ask this old house general contractor tom silva demonstrates the importance of a properly installed drip edge subscribe to this old house.
Some rain runoff by capillary action runs up under the shingle drip edge and down the fascia behind the gutter installing drip edge on a new roof or re roofing job.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Use a flat pry bar and hammer to pry the nails out of the drip edge gently.
Place a nail at one end then the other.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
It can be done.
There was no way that the gutter installe was going to get the upper edge of the gutter behind the drip edge.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
Be sure to tuck the drip edge under the starter strip and felt paper.
Make sure to support the long end of the cut if you let it fall after cutting it will bend down and kink the drip edge.
Make sure the outer edge extends over the gutter.
This is important to protect damage to your fascia soffits rafters.
Raise the shingles and push the top rim of your drip edge beneath them.
While the vertical leg should be placed 1 4 1 2 away from the fascia.